It began the construction of the most important photovoltaic solar park of the provincial east with the installation of the panels and trackers.
The Renewable energy Solar Park will start operating in March, since the installation of the equipment is a work that is done quickly. The solar park of San Martin is located in a land of 4 has approximately, in the locality of Palmira.
The work and maintenance require about 30 direct jobs and 13 indirect positions, and about 5 people to keep the park operational.